Saltar al contenido principal
  • Meet Enel
  • Stories
  • Sustainability
  • Investors
Quick links
Other Sites
  • Enel Corporate
  • Enel Green Power
  • Enel X
  • Enel Colina
  • Revoluz 100
  • Fundación Huinay
  • Fundación Pehuén
Relevant
    • ETHICAL CHANNEL
ciudad-05-1280x556.jpg

Energy Transition Roadmap

historia-electricidad-1280x556.jpg

Enel, a century delivering energy to the city and wellbeing to people

It is 100 years of contribution to the progress of the city and improvement of the quality of life of millions of people.

  • ES
  • EN
enel.cl
    • Home
    • ETHICAL CHANNEL
    • MEET ENEL
    • Directors
    • Management
    • Media
    • Work with Us
    • Suppliers
    • INNOVATION AND SUSTAINABILITY
    • INVESTOR
    • Enel Chile
    • Enel Distribución Chile
    • Enel Generación Chile
    • Interactive Integrated Report
    • Annual Reports
    • STORIES
Social Media

Follow us

  • Facebook
  • Twitter
Other Sites
  • Enel Corporate
  • Enel Green Power
  • Enel X
  • Enel Colina
  • Revoluz 100
  • Fundación Huinay
  • Fundación Pehuén
Relevant
    • ETHICAL CHANNEL
ciudad-05-1280x556.jpg

Energy Transition Roadmap

historia-electricidad-1280x556.jpg

Enel, a century delivering energy to the city and wellbeing to people

It is 100 years of contribution to the progress of the city and improvement of the quality of life of millions of people.

  1. enel.cl
  2. Meet Enel
  3. our power plants
  4. Sierra Gorda Este Wind Farm

Sierra Gorda Este Wind Farm

  • Facebook
  • Twitter
  • LinkedIn
  • Email
  • Print

Sierra Gorda Este Wind Farm

The Sierra Gorda Este wind farm is in the same name, approximately 60 kilometers from Calama's city in the Antofagasta Region.

Sierra Gorda Este has a total installed capacity of 112 MW. It generates more than 295 GWh per year, equivalent to the annual consumption needs of some 130,000 Chilean households, thus avoiding the emission of more than 140,000 tons of CO2 into the atmosphere per year.

The park is connected to the 220 KV Minera Sierra Gorda substations through a 38-kilometer transmission line. The energy generated is injected into the Central Interconnected System's electrical network.

  • Municipality: Sierra Gorda
  • Province: Antofagasta
  • Start of construction: 2016
  • Start of operation: 2016
  • Capacity: 112 MW
  • © Enel Chile | Enel Distribución Chile | Enel Generación Chile | Enel Green Power Chile
  • Term of use
  • Privacy policy
  • Ethical Channel

Follow us @EnelChile

  • X
  • Facebook
  • YouTube
  • LinkedIn
  • Instagram