Saltar al contenido principal
  • Meet Enel
  • Stories
  • Sustainability
  • Investors
Quick links
Other Sites
  • Enel Corporate
  • Enel Green Power
  • Enel X
  • Enel Colina
  • Revoluz 100
  • Fundación Huinay
  • Fundación Pehuén
Relevant
    • ETHICAL CHANNEL
ciudad-05-1280x556.jpg

Energy Transition Roadmap

historia-electricidad-1280x556.jpg

Enel, a century delivering energy to the city and wellbeing to people

It is 100 years of contribution to the progress of the city and improvement of the quality of life of millions of people.

  • ES
  • EN
enel.cl
    • Home
    • ETHICAL CHANNEL
    • MEET ENEL
    • Directors
    • Management
    • Media
    • Work with Us
    • Suppliers
    • INNOVATION AND SUSTAINABILITY
    • INVESTOR
    • Enel Chile
    • Enel Distribución Chile
    • Enel Generación Chile
    • Interactive Integrated Report
    • Annual Reports
    • STORIES
Social Media

Follow us

  • Facebook
  • Twitter
Other Sites
  • Enel Corporate
  • Enel Green Power
  • Enel X
  • Enel Colina
  • Revoluz 100
  • Fundación Huinay
  • Fundación Pehuén
Relevant
    • ETHICAL CHANNEL
ciudad-05-1280x556.jpg

Energy Transition Roadmap

historia-electricidad-1280x556.jpg

Enel, a century delivering energy to the city and wellbeing to people

It is 100 years of contribution to the progress of the city and improvement of the quality of life of millions of people.

  1. enel.cl
  2. Meet Enel
  3. our power plants
  4. El Sharon Photovoltaic Plant

El Sharon Photovoltaic Plant

Planta Solar El Sharon
  • Facebook
  • Twitter
  • LinkedIn
  • Email
  • Print

El Sharon Photovoltaic Plant

El Sharon photovoltaic plant is a Small Means of Distributed Generation (PMGD) project, located in the commune of Las Cabras, O'Higgins Region, and is accessed by driving along the 5 Sur highway and then taking an inland route.

The solar plant occupies an area of approximately 6.3 hectares. 

The interconnection point to the distribution system (owned by CGE) is located 0.1 km from the project site.

  • Municipality: Las Cabras
  • Province: Cachapoal
  • Start of construction: Q4 20210
  • Start of operations: Junio 2022
  • Capacity: 3 MW
  • © Enel Chile | Enel Distribución Chile | Enel Generación Chile | Enel Green Power Chile
  • Term of use
  • Privacy policy
  • Ethical Channel

Follow us @EnelChile

  • X
  • Facebook
  • YouTube
  • LinkedIn
  • Instagram